利国利国国际老牌w66老牌w66

2021-10-17

SIG Conducts Work Safety Rectification of SIG Building Reconstruction Project

To fully implement the spirit of the Notice for Conducting Work Safety Rectification in the Engineering Construction of Enterprises in the System of the Shanghai Municipal State-owned Assets Supervision and Administration Commission (Hu Guo Zi Wei Zong He [2021] No. 9) and the Notice for Conducting Work Safety Rectification in the Engineering Construction of Enterprises in the System of Shanghai International Group (Hu Guo Ji Ban [2021] No. 2) released by the Shanghai Municipal State-owned Assets Supervision and Administration Commission and the Shanghai Emergency Management Bureau, the Construction Management Office of SIG Building Reconstruction Project has ensured the fulfillment of the owner's primary responsibility, organized the owner, the constructor, the supervisor and other participants for special discussions and studies, required that they should strictly perform contractual responsibilities, establish the work safety responsibility system level by level, ensure the transfer and fulfillment of job responsibilities level by level, keep strengthening the identification and control of potential hazards on the construction site, progressively establish a long-acting mechanism of fundamentally eliminating potential hazards of accidents, and firmly contain work safety accidents.

利国利国国际老牌w66老牌w66(中国区)_利来老牌利国国际老牌w66官网

Based on the characteristics of the works in progress during the Spring Festival, according to the rectification work list, the Construction Management Office of SIG Building Reconstruction Project conducted a special inspection of engineering construction, convened regular meetings on work safety organization, urged the general contractor and other participants to strengthen the project safety organization system and education training, urged the constructor and the supervisor to conduct safety and technology disclosure of special schemes, identify and control potential hazards and conduct field process management, fulfilled the primary responsibilities of the general contractor and sub-project contractors, conducted strict safety management of works in progress, strengthened the supervision and inspection of key operation procedures such as construction, hot work, confined space and aerial work, as well as temporary electricity utilization on the construction site, and strictly investigated prominent problems such as working against time in violation of safety regulations.

利国利国国际老牌w66老牌w66(中国区)_利来老牌利国国际老牌w66官网

The Construction Management Office of SIG Building Reconstruction Project is striving to build a civilized construction site in Shanghai. Based on new requirements of epidemic control, it has urged the participants to control the epidemic and register the dynamic information of construction workers that returned to hometowns and Shanghai. Aiming at recent cold waves and freezing weather, the office has urged the participants to take protective measures in winter construction, and kept strengthening communication and coordination with China Foreign Exchange Trade System, to ensure the normal operation of the system in the construction period.

网站地图
友情链接:Ag平台官方网站  BOB半岛  k8凯发官网  AG博天堂918  k8国际官网  k8凯发天生赢家  AG官方网站  AG真人国际官网  AG尊龙平台  利来国国际网站  米乐m6  大发平台  凯时K66  j9九游会官网  豪运国际官网